Skip to main content

Godrej Aveline Master Plan

How a 10-acre NH-44 parcel is organised into 9 perimeter towers, a 2,936 sqmt clubhouse and 4,078 sqmt of landscaped parks for 814 residences plus 35 retail units.

01 /

Godrej Aveline 10-acre master plan visual

Godrej Aveline master plan showing 9-tower perimeter layout and central amenity spine on the 10-acre NH-44 site
Indicative master plan for buyer orientation: 9 residential towers (3B+G+15) on the outer boundary, the 35-unit retail block at the NH-44 street edge, and a central amenity spine with the 2,936 sqmt clubhouse, infinity pool, sports zones and 4,078 sqmt of landscaped parks. Confirm against the official RERA-filed sanctioned plan.
02 /

Godrej Aveline master plan: the real questions

A master plan is not a decorative aerial view. For Godrej Aveline, the question is whether 814 apartments distributed across 9 towers on 10 acres can sustain a premium NH-44 campus while handling 1,600+ vehicles, the 35-unit retail block, visitor flow, fire movement, services and resident amenities. From a planning angle, Godrej MSR City — Phase 3 keeps the reference local: internal roads, open-space placement, amenity access, and tower orientation all affect how the address will live after handover.

The sanctioned plan should show tower spacing, the dedicated retail-block frontage, basement ramps, drop-offs, service routes, utility zones, amenity placement and resident movement.

Plan elementWhat to inspectWhy it matters
Tower spacingDistance between facing unitsPrivacy, daylight and cross-ventilation
NH-44 entry / exitResident, visitor and service routesDaily traffic quality and arrival experience
Basement ramps (3B)Position and noise impactPremium experience at upper floors
Amenity placementClubhouse, pool, sports, kids areasCapacity and reachability from every tower
Utility zonesSTP, DG, waste, transformer, retail loadingNoise, smell and view impact

A 10-acre, 9-tower plan can work well if the towers are spaced intelligently, the retail block is buffered from residential zones and internal movement is calm. The sanctioned plan should separate resident entry, visitor movement, service access, fire driveways, basement ramps, retail-customer drop-off and pedestrian routes.

The master-plan question is whether the green space is usable after setbacks, ramps, service zones and fire movement. A premium apartment campus should protect privacy, shade, walking loops and senior spaces without forcing everyone through the same crowded core - especially when the campus carries 814 households inside the perimeter.

Tower spacing and inter-tower distance
Permanent NH-44 entry and service exit
Three-basement parking ramp position
Central amenity spine and phased delivery
STP, DG, waste and retail-block service zones

In depth

The master plan for a 10-acre apartment community on NH-44 is the document that determines whether the project delivers what its scale promises. Too many towers crowd the parcel and kill the central amenity spine. Too few towers fail to amortise the highway land cost at the configurations Godrej Aveline is offering. The launch sits at the premium-apartment sweet spot for the NH-44 belt - 814 residences across 9 towers (3B+G+15), 70%+ open and landscaped coverage, a 2,936 sqmt central clubhouse, a 35-unit integrated retail block at the highway frontage, and a perimeter tower arrangement that keeps the campus interior pedestrian-only.

This page reads the master plan layer by layer - land use, tower placement, the retail block, green and open space, road and circulation, basement parking, below-ground utilities, the sustainability infrastructure that runs underneath all of it, and the phasing logic across the five-year build cycle.

Land Use Breakdown

Land Use ComponentIndicative % of TotalIndicative Area
Built footprint (9 residential towers + retail block + clubhouse)~25-28%~2.5-2.8 acres
Central landscape spine and 4,078 sqmt landscaped park~35-40%~3.5-4.0 acres
Sports, pool and outdoor amenity zones~10-12%~1.0-1.2 acres
Internal driveways + perimeter porte-cocheres + pedestrian buffers~12-15%~1.2-1.5 acres
STP, transformer yards, service corridors, perimeter green buffer~8-10%~0.8-1.0 acres
Total100%10 acres

The numbers are indicative pre-launch positioning and are firmed at the Karnataka RERA filing. The key signal in the table is the 70%+ allocation to open and landscaped coverage when central spine, sports, pedestrian buffers and perimeter green are added together - materially better than the typical 50-60% bench mark for apartment-format communities at this density on the corridor. The 4,078 sqmt landscaped park anchors that headline number.

Tower Placement Strategy

Perimeter Tower Arrangement

All 9 residential towers sit along the outer boundary of the 10-acre parcel, leaving the campus interior unbuilt. The geometry produces three benefits at once: every tower gets a perimeter aspect (city-side, retail-block-side or perimeter-buffer-side), the inward face of every tower opens onto the central amenity spine, and the 2,936 sqmt clubhouse and 4,078 sqmt of landscaped parks sit reachable from every tower without crossing a vehicle lane. The arrangement is what makes the 814-residence count livable at 10 acres.

3 BHK and 4 BHK Distribution

The campus is laid out to mix 3 BHK (1,593 / 1,908 / 2,195 sqft) and 4 BHK + Maid (2,506 sqft) configurations across the 9 towers rather than segregating them into "tiers." Mixed-configuration stacking keeps the community socially balanced and preserves resale fungibility across the launch - neither configuration gets a "lesser" tower on the campus.

Tower Stack - 3B + G + 15

Every tower runs three basements, a ground level and 15 upper floors. The uniform stack simplifies the construction slab cycle, equalises lift wait times across towers, keeps the visual rhythm of the campus coherent and gives the perimeter facade a continuous datum line. Each tower's plinth carries its own lobby, mailroom and lift core; resident services (housekeeping, maintenance bay, security cabin) consolidate at the central spine.

Clubhouse and Amenity Cluster

The 2,936 sqmt clubhouse sits centrally on the campus, equidistant from most towers. The infinity-edge pool, 524 sqmt indoor sports hall, 166 sqmt gym, yoga pavilion, meditation zone, outdoor spa and 135 sqmt community hall cluster around or inside the clubhouse footprint. Outdoor sports - tennis, basketball, badminton, rock climbing wall, jogging and cycling track - sit at the campus interior near the perimeter buffer, separated from the clubhouse so they spread foot-traffic and visual interest across the central spine.

Integrated Retail Block

The 35-unit retail block is the campus's NH-44 face. It sits at the street edge, parallel to the highway, with its main customer entry directly off NH-44 and a separate service-loading zone away from the residential drop-off. The block buffers the residential towers from NH-44 acoustically and visually, gives residents a daily-needs convenience anchor at walking distance, and keeps non-resident retail customers out of the residential entry sequence. Common access between the residential plinth and the retail block is gated for security control.

Arrival Sequence

The arrival sequence reads: NH-44 access turn, security plaza with boom-barrier and RFID controls, a formal forecourt with landscape framing, and direct sightline to the clubhouse and central amenity spine. The arrival forecourt is the project's strongest visual moment at street level - the perimeter landscape buffer screens the highway, the retail block flanks the entry, and the clubhouse roofline crowns the central view.

Road and Circulation Network

Internal Driveways

  • Perimeter loop driveway connecting all 9 towers' porte-cocheres at podium level
  • Designed for resident drop-off and visitor circulation only (not through-traffic) with traffic-calming geometry - narrowed throats at tower entries and raised tabletop crossings at landscape spines
  • Surface treatment is differential - asphalted main loop and stone-paver finish near tower porte-cocheres and clubhouse forecourt

Vehicular Entry and Exit

Single primary entry from NH-44 with controlled service entry on the secondary edge. The dual-entry geometry is standard practice on 10-acre apartment formats to separate resident movement from service / maintenance / housekeeping / retail-loading flows. The retail block carries its own customer-entry and exit off NH-44, segregated from the residential security plaza.

Emergency Access

All 9 towers are designed to be reachable by fire tender within National Building Code (NBC) tender-distance norms - typically 18m hose-haul radius from a hard standing. Tender turning radius is preserved at the perimeter loop and the central forecourt.

Parking Strategy

  • Three full basements (3B) absorb all resident parking, EV charging and service vehicle stalls
  • Resident bays sized to one to two cars per residence depending on configuration
  • Visitor parking is at basement level (typically 1 visitor bay per 8-10 residences)
  • Retail-block customer parking is segregated to its own basement / surface bays
  • No on-podium parking - the surface area at podium level is reserved for landscape and amenity use
  • EV-charging provision distributed across resident and visitor bays per Karnataka building bye-laws

Below-Ground and Utility Infrastructure

Sewage Treatment Plant (STP)

A dedicated STP sized to community capacity - typically at 1.1x design-population load to allow margin - handles all sewage on site. Treated water is recycled in two loops: landscape irrigation across the 4,078 sqmt park and the perimeter buffer, and toilet flushing inside the residential towers (via dual plumbing).

Rainwater Harvesting

  • Recharge pits at the tower-plinth level for ground-water recharge
  • Storage tanks at campus level for the landscape and amenity loads
  • Designed to capture and reuse the monsoon flow rather than discharging to the storm-water drain on NH-44

Power Infrastructure

  • Underground HT and LT cabling - no overhead lines on the campus
  • 100% backup for residence essential loads (lighting, refrigeration, fans, point-load) and 100% backup for common areas, lifts and pumps
  • BESCOM-power sanction load filed with Karnataka RERA
  • Solar provision for clubhouse and street-lighting where elevation allows
  • EV-charging infrastructure across basement parking bays per current Karnataka building bye-laws

Water Supply

  • BWSSB-water connection per Karnataka RERA filing
  • STP-treated water reuse loop closes the non-potable load (flushing and landscape)
  • Dual plumbing keeps treated water out of the potable loop

Telecom and Smart Infrastructure

  • Fiber-to-the-tower with provision for primary + redundant carrier at every residence
  • Community-wide Wi-Fi at amenity zones and clubhouse
  • IoT-ready common-area metering for power and water
03 /

Godrej Aveline open space and landscape

The useful open-space question is whether it is accessible and shaded from the perimeter tower plinths. A central spine with the 4,078 sqmt landscaped park, the amphitheatre, jogging loop, kids play and senior seating has a different value from leftover setbacks at the tower base.

Central Green Spine and 4,078 sqmt Landscaped Park

Spine Geometry

A continuous landscape spine runs from the NH-44 forecourt through the central clubhouse zone to the rear boundary, organising the campus into two halves around the central amenity cluster. The spine carries the primary pedestrian movement, water features at landscape nodes, the community lawn, the amphitheatre, the senior citizens' zone and the children's play areas. The 4,078 sqmt landscaped park is the principal soft-scape inside this spine.

Tower Pockets

Each tower opens its inward face onto a landscape pocket - typically 400-800 sqmt of softscape with native planting, seating nodes and a small water feature or sculpture node. The pockets do the double duty of giving the tower residents a private outdoor amenity at the plinth level and giving the campus its scale of green at the spine level.

Perimeter Buffer

A continuous planted belt runs along the project's boundary - especially along the NH-44 frontage and the retail-block edge. The buffer separates the residential towers from the highway acoustically and visually, holds the jogging and cycling track on the inner edge and the mature canopy planting on the outer edge. The buffer is the principal sound-attenuation layer for the perimeter-facing units.

Native Planting and Mature Canopy Intent

Plant palette is shaped to native and low-water species with an explicit mature-canopy ambition - the project is designed to read greener in year five than in year one. Species selection favours indigenous trees (Honge, Mahogany, Pongamia, Tabebuia, Gulmohar, Indian Almond) and ground cover that survives Bengaluru's monsoon-summer cycle without supplemental irrigation beyond the STP reuse loop.

Pedestrian Movement and Amenity Distribution

Walking and Jogging Loop

A continuous walking and jogging loop runs along the perimeter buffer and through the central spine, looping the entire campus inside a single, shaded, traffic-isolated track. At the scale of the project - 10 acres - the loop runs roughly 800-1,000 m uninterrupted, with a parallel cycling lane separated where width permits. The loop returns directly to the clubhouse forecourt.

Landscape Nodes

The central green spine carries four to six landscape nodes - water features, sculpture moments, seating courts, children's play, senior-citizens' plaza, the pet zone and the community amphitheatre. Each node is a destination inside a one-minute walk from at least three towers.

Wayfinding

Tower-level signage and lighting carry the campus's wayfinding language. Numbering follows a consistent grid - tower letter, floor, unit number - rather than a postcode-style address so delivery and emergency services find a residence on the first attempt.

Sustainability Infrastructure

The sustainability spec runs across every tower and the central spine.

Energy

  • Solar provision for clubhouse and street-lighting load
  • ECBC-compliant clubhouse design for envelope and HVAC efficiency
  • 100% LED common-area lighting
  • Future-ready solar provision at tower rooftop where elevation allows

Water

  • STP reuse covers landscape irrigation and tower-flushing loads
  • Rainwater harvesting designed for ground-water recharge first, storage second
  • Native planting palette reduces irrigation load on the 4,078 sqmt park
  • Drip and bubbler irrigation in landscape pockets - no overhead sprays

Waste

  • Source-segregation at residence level (dry, wet, hazardous)
  • Community composting node for organic fraction
  • Centralised dry-waste sorting station + tie-up with BBMP-authorised processors
  • Separate waste handling for the 35-unit retail block via dedicated service-zone access

Certification

  • IGBC Gold pre-certification target - Godrej Properties' default sustainability benchmark on Bengaluru launches
04 /

Godrej Aveline phasing and delivery

Towers in a 9-tower apartment campus are typically released in phases. Early buyers should know which towers are released first, what amenities arrive with each phase, and what construction continues around them through the five-year build cycle to the 31 March 2031 possession date.

Construction Logistics on a Live NH-44 Site

The 10-acre campus is structured for phased construction without disrupting residents who move in during late-phase handover. The phasing strategy - to be confirmed at hard launch - typically follows clubhouse-and-amenity-first, then tower clusters in concentric phases outward from the central amenity zone. Construction movement uses the secondary service entry away from the NH-44 customer face, so the residential drop-off and the retail-block customer experience are preserved as construction continues. Site logistics also handle dust and noise mitigation across the boundary on a continuously-trafficked highway.

The retail block is typically scheduled to commission alongside the first tower handover so day-one residents have daily-needs convenience at the campus edge.

Indicative Phasing Timeline

PhaseWindowStatus
Land acquisition and master planningPre-2026Completed
Karnataka RERA registrationMarch 2026Completed
Pre-launch and booking-open2026Active
Site mobilisation and excavation (3B)2026-2027Planned
Central amenity zone and clubhouse start2027Planned
Phase 1 tower handover (model and lead towers)2029-2030Planned
Retail block commissioning2030Planned
Final tower handover and full possession31 March 2031Scheduled (per RERA filing)

The five-year build cycle from RERA registration to full possession is typical for a 3B+G+15 stack at 9-tower scale. Phase-1 handover buyers should plan for the central amenity spine to be commissioned around their move-in window; late-phase buyers will receive a fully-commissioned campus at handover.

Reading the Master Plan as a Buyer

The signals to look for when comparing the official Aveline sanctioned plan against your shortlist:

1. Residence count vs 10 acres. Aveline's 814 residences at 10 acres translate to ~81 units per acre - inside the standard band for premium 3B+G+15 apartment communities on the NH-44 corridor. Anything materially above 90 units/acre tightens the density story; anything below 70 lifts price per residence. 2. Open space %. Below 60% would change the lifestyle category; the 70%+ Aveline holds the premium-apartment promise. 3. Inter-tower distance. Distances below 18-20 m between facing towers start to compromise privacy and cross-ventilation. The perimeter arrangement at Aveline is designed to push inter-tower distances above the threshold. 4. Clubhouse-to-residence ratio. The 2,936 sqmt clubhouse across 814 residences is ~3.6 sqmt (~38 sqft) per residence - in the upper band for branded premium apartment inventory. 5. Pedestrian-loop length. An 800-1,000 m loop is the rule for a 10-acre campus; shorter loops indicate landscape lost out to building footprint. 6. Retail-block segregation. The 35-unit retail block must have an independent customer-entry off NH-44 and a service-loading dock segregated from the residential drop-off - confirm both on the sanctioned plan.

The official sanctioned plan is on file with Karnataka RERA as part of registration PRM/KA/RERA/1251/309/PR/020326/008501. The microsite will update with any subsequent revision filed during the construction window.

05 /

Godrej Aveline master plan FAQ

How is the 10-acre site organised at Godrej Aveline?

All 9 residential towers sit along the outer boundary of the 10-acre parcel, leaving the campus interior unbuilt. The 2,936 sqmt clubhouse, infinity-edge pool, sports courts, jogging and cycling track and 4,078 sqmt landscaped park occupy the central zone - reachable from every tower without crossing vehicle lanes.

Is the 70% open-space claim verifiable?

Yes, in directional terms. The perimeter tower arrangement, combined with the central clubhouse, sports zones and 4,078 sqmt of landscaped parks listed in the RERA filing, support the open-space math. The exact figure is confirmed in the registered sale agreement and Karnataka RERA filings.

How many towers and floors are there?

Nine residential towers, each at 3 basements + ground + 15 upper floors. A separate retail block houses 35 units. Total project count is 849 structures-equivalent units across the 10 acres - 814 residences and 35 retail.

Is there a separate retail block?

Yes. The master plan includes a 35-unit integrated retail block along the NH-44 street edge, which is designed to serve project residents and the immediate Kogilu Cross neighbourhood with daily-needs convenience.

How is vehicular and pedestrian movement separated?

Vehicle entry is segregated to perimeter drop-off and basement parking ramps, while the interior amenity spine is pedestrian-only. The basement levels (3B) absorb resident parking, EV charging bays and service vehicle stalls so the surface area at podium level is reserved for landscape and amenity use.

Are amenity zones distributed or central?

Centralised. The 2,936 sqmt clubhouse, sports zones, infinity pool and landscaped park are clustered in the central spine. Per-tower amenities - lobbies, lift cores, mailrooms, service stairs - are within each tower's plinth. Senior citizens' zone, pet zone and co-working areas sit within the central amenity belt for shared access.

Godrej Aveline: Request the sanctioned master plan

Request the current Karnataka RERA-filed master plan PDF, the unit-wise cost sheet, floor plans, payment schedule and a Kogilu Cross site-visit slot. Independent legal review is recommended before any non-refundable payment.

Contact us